Production plan
The customer's production planning ran in Excel, linked to the ERP over ODBC. This app replaces that: planning moved into Business Central, and the planner's administrative time dropped substantially.
- Platform
- Microsoft Dynamics 365 Business Central
- Type
- Extension (AL)
- Area
- Production planning, capacity planning
- Replaces
- Excel + ODBC based planning
What it is for
With a production plan kept in Excel, something can always end up in the wrong place, a formula can break, or the ODBC link simply does not get refreshed. And the mistake does not surface where it was made — it surfaces in production.
The app puts planning where the data is created. It pulls the sales orders for the given period into the plan through a standard dialog, then builds the planning master data once the parameters are set. That is what calculates the values planning needs: sales prices for the planned, completed and remaining quantities, total operation time, standard costs, margin, the raw material cost of the product, the state of the special material flag, and the planned time requirement per work centre group type.
The work centre group type is set on the work centre group card through a page extension, and the app aggregates on that basis. Custom jobs — from the Sample request app — can be fitted into the plan together with their capacity and material requirements.
What it does
-
Pulling in sales orders
The sales orders for the given period enter the plan through a standard dialog.
-
Planning master data
Once the parameters are set, the app calculates the values planning needs: prices, operation time, costs, margin and the time requirement per work centre group type.
-
Material availability
Checking the material requirements of the plan — previously one of the most time-consuming manual steps.
-
Headcount planning per work centre group
The headcount the plan requires, broken down by work centre group.
-
Work centre group load and product list
The list of products to be manufactured per work centre group, broken down by week.
-
Plan status report
A compact report on the current state of the plan and the headcount needs per work centre group.
-
Scheduling custom jobs
Sample production can be fitted into the plan with its capacity and material requirements, and is included in the headcount calculation.
-
Context-dependent filtering
Filtering follows the record the pointer is on.
What it is built on
Related
Is your planning still in Excel? Let us move it into Business Central.
Request a quote